Electrifying process heat
Part of the heat demand moves to electricity. The accumulator charges when power is available, not necessarily when the process is drawing heat.
TESSA · Industrial thermal storage
TESSA stores energy as heat in solid materials, then delivers it to the process in the form required.
15 MWh in operation in Valleyfield
Needs
Part of the heat demand moves to electricity. The accumulator charges when power is available, not necessarily when the process is drawing heat.
The heat is already electric. Charging is moved in time, which can reduce peak power demand depending on project conditions.
The site’s electrical service does not cover heat peaks. Storage lets charging be spread over more hours.
Depending on the configuration, recovered heat can contribute to charging. The source is first qualified on temperature, flow and continuity.
These levers do not automatically add up. The starting point is the site’s current heat source.
Integration
The accumulator connects to existing heat circuits through heat exchange equipment selected for the application. Equipment already in place can remain in service.
Tessart supplies the thermal storage. Site integration is designed with your engineering team or the integrator of your choice.
How it fits together
Input
Accumulator
Output
Use
Simplified diagram. The output is heat: the accumulator does not return electricity. Heat exchange equipment is selected for each application.
Assessment
The heat demand
The electrical supply
Applications to assess
Hot air for drying materials or products.
Heat delivered through thermal oil, glycol or air, depending on the process.
Process or service hot water.
Steam generation through suitable integration.
Potential applications, to be assessed for each site. Not all of them have been deployed to date.
Project steps
We outline the process, the current heat source and the objective.
Consumption profile, temperatures, available power and rates.
A first sizing, in energy and in power, and a read on whether the project is worth pursuing.
Detailed design and connection to the process, with your engineering team.
Bring your consumption profile. The first conversation is about qualifying the site.